First HyLIGHT-2 Test with CFRP Casing
HyEnD is proud to announce that the first 15 s test firing of its lightweight engine HyLIGHT-2 with CFRP-casing was a success! In the upcoming weeks, the operation time will be increased to 25s. The test was conducted at the test bench M11 of the DLR Institute of Space Propulsion. Thanks to all who made this achievement possible!